Site Logo
Posts Personal
Gallery
🖼️ Overview 😂 Memes 🎬 Videos ▶️ YouTube
About
← Back

This Image Showsteam Members at Michoud Assembly Facility Loading the First C...

Artemis II April 14, 2026
This image showsteam members at Michoud Assembly Facility loading the first c...

This image showsteam members at Michoud Assembly Facility loading the first core stage that will help launch the first crewed flight of NASA’s SLS (Space Launch System) rocket for the agency’s Artemis II mission onto the Pegasus barge on Tuesday, July 16, 2024. The barge will ferry the core stage on a 900-mile journey from the agency’s Michoud Assembly Facility in New Orleans to its Kennedy Space Center in Florida.

Image Credit: NASA

Recommended Further Browsing

Commander Reid Wiseman is greeted by NASA's Flight Operations...

Commander Reid Wiseman is greeted by NASA's Flight Operations...

Artemis II
Technicians with NASA and Lockheed Martin operate a 30-ton crane to move NASA...

Technicians with NASA and Lockheed Martin operate a 30-ton crane to move NASA...

Artemis II
NASA astronauts Reid Wiseman, commander; left, Christina Koch, mission specia...

NASA astronauts Reid Wiseman, commander; left, Christina Koch, mission specia...

Artemis II
The Moon sets behind NASA’s Artemis II SLS (Space Launch System) rocket and O...

The Moon sets behind NASA’s Artemis II SLS (Space Launch System) rocket and O...

Artemis II
Richard Djarbeng

Richard Djarbeng's website with technical and personal posts. Tech blogs + real-life adventures in East Africa, USA and Europe

Pages

  • Home
  • About
  • Authors
  • Technical Posts
  • Personal Posts
  • 📚 Enlighten
  • Search
  • Tags
  • Categories

Gallery & Media

  • Gallery Overview
  • All Videos
  • YouTube Videos
  • Instagram Videos
  • TikTok Videos
  • Artemis II Media Collection

Feeds & Sitemaps

  • RSS Feed
  • XML Sitemap
  • Image Sitemap

Connect

  • Contact Me
© 2026 Richard Djarbeng. All rights reserved.