Site Logo
Posts Personal
Gallery
🖼️ Overview 😂 Memes 🎬 Videos ▶️ YouTube
About
← Back

Inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Ce...

Artemis II April 14, 2026
Inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Ce...

Inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians with the agency’s Exploration Ground Systems integrate the left forward center booster segment for the NASA’s SLS (Space Launch System) rocket onto the left center center segment atop the mobile launcher on Thursday, Jan. 30, 2025. The NASA “worm” insignia can be seen on both the center center booster segments. The boosters will help support the remaining rocket components and the Orion spacecraft during final assembly of the Artemis II Moon rocket and provide more than 75 percent of the total SLS thrust during liftoff from NASA Kennedy’s Launch Pad 39B.

Image Credit: NASA

Recommended Further Browsing

Cover image for post - King Promise Drops a Global Banger: "Terminator" feat. Young Jonn (2023)

Cover image for post - King Promise Drops a Global Banger: "Terminator" feat. Young Jonn (2023)

Other
Construction is complete on the main flame deflector in the flame trench at L...

Construction is complete on the main flame deflector in the flame trench at L...

Artemis II
NASA’s Artemis II Space Launch System (SLS) rocket and Orion spacecraft, secu...

NASA’s Artemis II Space Launch System (SLS) rocket and Orion spacecraft, secu...

Artemis II
NASA’s Space Launch System rocket carrying the Orion spacecraft with NASA ast...

NASA’s Space Launch System rocket carrying the Orion spacecraft with NASA ast...

Artemis II
  • Richard Djarbeng
  • Contact Me
© 2026

    Richard Djarbeng's website with technical and personal posts. Tech blogs + real-life adventures in East Africa, USA and Europe