Site Logo
Posts Personal
Gallery
🖼️ Overview 😂 Memes 🎬 Videos ▶️ YouTube
About
← Back

NASA

Artemis II April 14, 2026
NASA

NASA’s mobile launcher is secured inside High Bay 3 at the Vehicle Assembly Building (VAB) on Sept. 11, 2018, at NASA’s Kennedy Space Center in Florida. In view are several levels of the new work platforms. The crew access arm, at the top, is being extended. The mobile launcher will spend seven months in the VAB undergoing testing. The 380-foot-tall structure is equipped with the crew access arm and several umbilicals that will provide power, environmental control, pneumatics, communication and electrical connections to the agency’s Space Launch System and Orion spacecraft. Exploration Ground Systems is preparing the ground systems necessary to launch SLS and Orion on Exploration Mission-1, missions to the Moon and on to Mars.

Image Credit: NASA

Recommended Further Browsing

Dosti (Full Video) RRR - from Youtube

Dosti (Full Video) RRR - from Youtube

Music of RRR
Pushing Changes to  Production on Friday- What Could Possibly Go Wrong

Pushing Changes to Production on Friday- What Could Possibly Go Wrong

Entertainment
The Moon rises behind NASA’s Artemis II SLS (Space Launch System) rocket and ...

The Moon rises behind NASA’s Artemis II SLS (Space Launch System) rocket and ...

Artemis II
There will be signs

There will be signs

memes
Richard Djarbeng

Richard Djarbeng's website with technical and personal posts. Tech blogs + real-life adventures in East Africa, USA and Europe

Pages

  • Home
  • About
  • Authors
  • Technical Posts
  • Personal Posts
  • Search
  • Tags
  • Categories

Gallery & Media

  • Gallery Overview
  • All Videos
  • YouTube Videos
  • Instagram Videos
  • TikTok Videos
  • Artemis II Media Collection

Connect

  • Contact Me
© 2026 Richard Djarbeng. All rights reserved.